ACME Suryodaya commissions 240.720 MWh BESS project in Rajasthan
(01 Jul 2026)

Back
ACME Solar Holdings through its wholly owned subsidiary i.e. ACME Suryodaya, has commissioned 240.720 MWh capacity of Battery Energy Storage System (BESS) project located at Village: Sanwara and Mehar Nagar, Tehsil-Pokhran, Dist: Jaisalmer, Rajasthan, on 30 June 2026. The commercial operation date (COD) for the same shall be 02 July 2026.

With this, ACME Suryodaya has achieved a commissioned capacity of 285 MW / 842.624 MWh.

Copyright © 2026 Arihant Capital Markets Ltd. All rights Reserved.

Designed, Developed and Content powered by CMOTS InfoTech (ISO 9001:2015 & ISO/IEC 27001:2022 Certified)

x
  • QR-CodeNew