NTPC adds installed capacity of 800 MW of Patratu Vidyut Utpadan Nigam
(18 May 2026)

Back
NTPC announced that Unit-2 (800 MW) of Patratu Vidyut Utpadan Nigam (PVUNL), a subsidiary of NTPC, has successfully completed trial run operation and consequently included in the installed capacity of NTPC. With this, the total installed capacity of NTPC group stands at 90,668 MW.

Copyright © 2026 Arihant Capital Markets Ltd. All rights Reserved.

Designed, Developed and Content powered by CMOTS InfoTech (ISO 9001:2015 & ISO/IEC 27001:2022 Certified)

x
  • QR-CodeNew